3.
Safety regulations
3-6
Check the accuracy of pressure and
temperature indicators at regular intervals.
If the admissible tolerance limits have been
exceeded, these devices must to be
replaced.
Before removing or overhauling any
equipment, ensure that all moveable parts
are safely secured. After completion of
repair work, always verify that no tools,
loose parts or cloths have been left in or on
the unit, units must be cycled several times
in order to ensure that there are no
mechanical faults in the unit.
The fastening of loads and the instructing of
forklift or crane operators should be
entrusted to experienced personnel only.
The person giving the instructions must be
within sight or voice contact with the
operator.
For carrying out overhead assembly work
always use specially designed or otherwise
safety-orientated ladders and working
platforms. Never use machine parts as a
climbing aid. Wear a safety harness when
carrying out maintenance work at greater
heights.
Clean the machine, especially connections
and threaded unions, of any traces of oil,
fuel or preservatives before carrying out
maintenance or repair work! Never use
aggressive detergents! Use lint-free
cleaning rags!
After cleaning, remove all covers and
masking completely and allow the unit to
dry before returning unit to service!
Always re-tighten screwed connections
which have been loosened for maintenance
and repair work.
If the set-up, maintenance or repairs
require the removal of safety equipment,
this equipment has to be replaced and
checked immediately after these activities.
Ensure that replacement parts are disposed
of in a safe and environmentally friendly
manner in accordance with all applicable
local, regional and national laws, rules and
regulations.
Use only genuine MAKO fuses with the
specified current rating. Switch off the
machine/unit immediately if trouble occurs
in the electric system.
Work on any electrical system or equipment
must only be carried out by a skilled
electrician or by specially instructed
personnel under the control and supervision
of such an electrician and in line with the
relevant electrical engineering rules.
If regulations require, the power supply to
parts of machines and plants on which
inspection, maintenance and repair work is
to be carried out must be cut off. Before
starting any work, check the de-energized
parts for the presence of power and ground
or short-circuit them in addition to
insulating adjacent live parts and elements.
The electrical equipment of this unit is to be
inspected and checked at regular intervals.
Defects such as loose connections or
scorched cables must be rectified
immediately.
3.6
Warning Of Special Dangers
Electric energy
Summary of Contents for Mako SCFS
Page 1: ...Document No 150SCFS Global 002 SCFS User Instruction Manual SCFS User Instruction Manual ...
Page 5: ......
Page 30: ...APP A Date Comments Operator ...
Page 31: ... ...
Page 32: ... ...