6.
Operating Instructions
6-3
21. - Close fill valve(see section 4.3 #11)
when bottle pressure(see section 4.3 #10)
and regulator outlet pressure(see section
4.3 #8) equalize at desired pressure and
continue to step #22.
or
If pressures equalize and desired pressure
is not obtained continue to step#24
22. - Remove filled bottles per steps #11
thru #16 and repeat process beginning at
Steps 1 until all bottles are filled.
23. - Continue to step #40
24. - Close “From Bank #2” valve.(see
section 4.3 #3)
25. - Open “From Bank #3” valve.(see
section 4.3 #3)
26. - Close fill valve(see section 4.3 #11)
when bottle pressure(see section 4.3 #10)
and regulator outlet pressure(see section
4.3 #8) equalize at desired pressure and
continue to step #27.
or
If pressures equalize and desired pressure
is not obtained continue to step#29
27. - Remove filled bottles per steps #11
thru #16 and Repeat process beginning at
Steps 1 until all bottles are filled.
28. - Continue to step #40
29. - Close “From Bank #3” valve.(see
section 4.3 #3)
30. - Open “From Bank #4” valve.(see
section 4.3 #3)
31. - Close fill valve(see section 4.3 #11)
when bottle pressure(see section 4.3 #10)
and regulator outlet pressure(see section
4.3 #8) equalize at desired pressure and
continue to step #32.
or
If pressures equalize and desired pressure
is not obtained continue to step#34
32. - Remove filled bottles per steps #11
thru #16 and Repeat process beginning at
Steps 1 until all bottles are filled.
33. - Continue to step #40
34. - Close “From Bank #4” valve.(see
section 4.3 #3)
35. - Start up compressor if it is not already
started and open Bypass valve
36. - Close fill valve(see section 4.3 #11)
when bottle pressure(see section 4.3 #10)
and regulator outlet pressure(see section
4.3 #8) equalize at desired pressure.
37. - Remove filled bottles per steps #11
thru #16 and Repeat process beginning at
Steps 1 until all bottles are filled.
38. - Continue filling bottles from stored air
and topping-off directly from the
compressor until all Banks are depleted.
39. - Continue filling empty tanks from
compressor when all Banks are depleted Per
6.1.1 Filling From Compressor .
40. - When all tanks are filled and removed
from unit make sure all valves on fill panel
and in containment drawer are closed.
41. - Open all To Bank valves(see section
4.3 #3) to any Banks which need to be filled
and start up compressor if it is not already
started
42. - Close all To Bank valve(see section 4.3
#3) when compressor reaches it’s set-point
and all banks are at full pressure.
43. - Shutdown Compressor.
44. - Record any pertinent information in
your daily log and record the time out.
These procedures can be varied to suite the
status of the system and the operators
preferences but safety procedures must
never be compromised.
This procedure is an example of how to run
a cascade fill cycle with all banks full. when
all Banks are not full. The cascade fill cycle
should run starting from the Bank with the
lowest pressure, which is over 1000psi, in
order of pressure to the bank with the
highest pressure.
Note.
Note.
Summary of Contents for Mako SCFS
Page 1: ...Document No 150SCFS Global 002 SCFS User Instruction Manual SCFS User Instruction Manual ...
Page 5: ......
Page 30: ...APP A Date Comments Operator ...
Page 31: ... ...
Page 32: ... ...