4.
Installation
The DIGITEL MPCq is a full 19-inch rack controller. No additional hardware
needed to install in a standard 19-inch wide device rack.
Maintain a 2.52 in. (64 mm) clearance behind controllers for cable bend
radius and proper airflow.
CAUTION:
This equipment uses a detachable power supply cord. Do not replace with
inadequately rated supply cords.
4.1.
Required items
You will need the following items to install the controller:
1.
A 3-wire, detachable, universal input power cable (included).
2.
A High Voltage (HV) cable for each pump (ordered separately).
3.
A safety ground cable for each pump (ordered separately).
4.2.
Installation procedure
1.
Place the controller in its location and secure as necessary.
2.
Connect the safety ground cable to the pump and the safety ground stud
at the DIGITEL rear panel.
3.
Connect the high voltage cable to the ion pump and the high voltage
connector on the DIGITEL rear panel (J501 - J504).
4.
If high voltage cable has an optional safeconn feature (HV interlock), an
additional connector is part of the high voltage cable. Connect it to the
safeconn connector (J401 - J404), otherwise, use safeconn shorting jumper
cable to connect to safeconn connector (J401 - J404). Safeconn interlock
must be satisfied, otherwise HV cannot be turned on.
5.
Verify correct input voltage requirements. Connect mains AC power cable
to input power receptacle on the controller rear panel.
Page 13
900034_C
900034_C - Installation