Revision 14
154
August 02, 2019
Figure 7-3: Insertion of Tape End into Take-up Reel
k) Replace the screw-on disks onto the supply and take-up reel.
l) Take up any slack in the tape by rotating the tape reel on the supply reel clockwise until
the tape is tight.
The correct installation of tape on the analyzer is shown in Figure 7-4. The image on the
left shows the completed tape installation without the anti-coning disks and the one on
the right shows the tape installation with the disks.
Figure7-4: Installation of Sensing Tape
m) Advance tape a few inches with the
TAPE ADV
key.
n) Check the tape for proper take-up.
o) Re-calibrate the sensor by selecting the
Sens
on the GEN menu using the key pad.
Press the EDIT key and press ENTER key to toggle the parameter to ON. The sensor
will calibrate and then automatically go online.
p) Check that the mV reading is 0 mV +/- 10 mV at the start of the cycle.
q) Reset the tape length to 330 ft through the keypad or the GUI.
Summary of Contents for ProTech903
Page 2: ......
Page 96: ...Revision 14 96 August 02 2019 Figure 5 19 Event Log...
Page 122: ...Revision 14 122 August 02 2019 Figure 5 38 Typical Modicon with Floating Point List...
Page 124: ...Revision 14 124 August 02 2019 Figure 5 40 Expanded Modbus Nodes...
Page 175: ...Revision 14 175 August 02 2019 Figure 9 17 Non Isolated 4 20 mA Inputs...
Page 190: ...Revision 14 190 August 02 2019...