Table 21: Analyzer Warnings
Warning
Explanation
Low Cabinet
Temperature
Control cabinet internal temperature is below low cabinet temperature
setpoint
High Cabinet
Temperature
Control cabinet internal temperature is above high cabinet temperature
setpoint
Low Reference
Peak
Spectrometer signal peak height when analyzer is in back purge mode
<24000 A/D counts
High Integration
Period
Integration period required to obtain an in-range spectrometer signal
when analyzer is in back purge mode > 500 milliseconds.
High Absorbance
Measured absorbance >2.0AU when analyzer is in sampling mode.
High Sulfur
Vapour
Measured sulfur vapour content exceeds high sulfur vapour
concentration warning setpoint
Some of these warnings may clear by themselves but others will not be able to be cleared
without performing maintenance on the analyzer. Refer to section 7.2 for more detail on how
to troubleshoot active warnings.
5.2.4 Spectrum Page
The
Spectrum
page shown in Figure 50 shows identical information to the Spectrum
panel
on the analyzer’s local display.
Figure 50: Spectrum Page
The
Spectrum Curve,
or transmission spectrum, displayed on this page shows the intensity
of light measured at each of the 2048 pixels of the spectrometer. The exact X (pixel number)
and Y (A/D counts) coordinates of each data point on the curve can be determined by placing
the mouse cursor over the data point of interest. The Y-axis scale can be adjusted by clicking
on the
Change Spectrum Curve Display Y Axis
button. The
Y-Axis Maximum Value
dialog box shown in Figure 51 will then appear.
Summary of Contents for 943-TGX-CE
Page 132: ...Revision 4 132 April 2020 Figure 81 Oven Cabinet Door Removed ...
Page 133: ...Revision 4 133 April 2020 Figure 82 Control Cabinet Door Removed ...
Page 134: ...Revision 4 134 April 2020 Figure 83 Power Steam Air Signals Connection Details ...
Page 135: ...Revision 4 135 April 2020 Figure 84 AC Wiring Schematic ...
Page 136: ...Revision 4 136 April 2020 Figure 85 DC Signals and Wiring Diagram ...
Page 137: ...Revision 4 137 April 2020 Figure 86 Flow Diagram ...