Revision 4
28
April 2020
HOT terminal and the neutral wire to the NEU terminal on the terminal block indicated
in Figure 8.
3. All installed wires must be neatly tucked down past the flame proof enclosure lid
threads. They MUST NOT loop past the high point of the black plastic cover inside the
flame proof enclosure.
4. Once the wires are neatly placed in the flame proof enclosure, reinstall the flame proof
enclosure lid and the purge controller box front cover.
DO NOT energize the AC power supply to the analyzer at this time. The
analyzer system will be powered up at the time of commissioning by
Galvanic Applied Sciences Inc. personnel.
2.4.4 Connection of the Analog Signal Cables
Analog signal cables are connected to the output signal disconnect junction box located
below the control cabinet, as shown in Figure 9.
Figure 9: Location of Signal Disconnect Junction Box
The user may connect to any or all of the available analog output signal terminals as per
their specific requirements. The analog outputs are all loop powered. When loop power is
provided and the current loop between the analyzer and the external control computer is
Summary of Contents for 943-TGX-CE
Page 132: ...Revision 4 132 April 2020 Figure 81 Oven Cabinet Door Removed ...
Page 133: ...Revision 4 133 April 2020 Figure 82 Control Cabinet Door Removed ...
Page 134: ...Revision 4 134 April 2020 Figure 83 Power Steam Air Signals Connection Details ...
Page 135: ...Revision 4 135 April 2020 Figure 84 AC Wiring Schematic ...
Page 136: ...Revision 4 136 April 2020 Figure 85 DC Signals and Wiring Diagram ...
Page 137: ...Revision 4 137 April 2020 Figure 86 Flow Diagram ...