Revision 4
25
April 2020
Figure 5: Oven Enclosure Tubing Removed
3. Insert the probe into the packing gland at the bottom of the oven indicated in Figure 6 until
it reaches the steam jacketed ball valve.
Figure 6: Inserting the Sample Probe
4. Open the steam jacketed ball valve and continue inserting the probe until the probe
flange contacts the packing gland.
Tubing removed
Packing gland
Sample
probe
Summary of Contents for 943-TGX-CE
Page 132: ...Revision 4 132 April 2020 Figure 81 Oven Cabinet Door Removed ...
Page 133: ...Revision 4 133 April 2020 Figure 82 Control Cabinet Door Removed ...
Page 134: ...Revision 4 134 April 2020 Figure 83 Power Steam Air Signals Connection Details ...
Page 135: ...Revision 4 135 April 2020 Figure 84 AC Wiring Schematic ...
Page 136: ...Revision 4 136 April 2020 Figure 85 DC Signals and Wiring Diagram ...
Page 137: ...Revision 4 137 April 2020 Figure 86 Flow Diagram ...