Revision 4
24
April 2020
1. Put the new gasket in place and move the analyzer system into position placing the
four bolts through the steam jacketed nozzle flange holes.
2. Place the four nuts onto the bolts and tighten.
3. Inspect the flange connection using company and/or regulatory agency procedures to
ensure that the connection is leak-tight (no gases are escaping).
4. Check that process gas is not leaking into the analyzer oven.
When the analyzer system is securely fastened to the process sample point flange, make
sure that the analyzer framework is secured to the support structure. This is to ensure that
the framework and support structure, not the flange connection, are bearing the weight of
the analyzer system.
2.4.3 Installation of the Sample Probe
Once the analyzer system is securely installed on the process pipe, the sample probe
can
be installed by following the procedure below.
1. Remove the hole plug from the top of the oven cabinet as shown in Figure 4.
Figure 4: Hole Plug in Oven Cabinet Removed
2. Remove the black cover from the
oven enclosure
and disconnect the tubing
connected to the
measurement cell block
as shown in Figure 5.
Cover removed.
Replace after sample probe
installed.
Summary of Contents for 943-TGX-CE
Page 132: ...Revision 4 132 April 2020 Figure 81 Oven Cabinet Door Removed ...
Page 133: ...Revision 4 133 April 2020 Figure 82 Control Cabinet Door Removed ...
Page 134: ...Revision 4 134 April 2020 Figure 83 Power Steam Air Signals Connection Details ...
Page 135: ...Revision 4 135 April 2020 Figure 84 AC Wiring Schematic ...
Page 136: ...Revision 4 136 April 2020 Figure 85 DC Signals and Wiring Diagram ...
Page 137: ...Revision 4 137 April 2020 Figure 86 Flow Diagram ...