21 

2. The heating system is not heated 

(is slightly heated). 

High specific electric resistance of 

water. The specified heat-transfer 

agent temperature is lower than the 

required temperature. 

Boiler connection diagrams and 

radiators installation diagrams do 

not correspond to the diagrams 

described in the given Operation 

manual. 

Pay scrupulous attention to the 

recommendations of the given 

Operation manual for the heat-

transfer agent. 

Increase the specified temperature 

of the heat-transfer agent. 

Put the connection and installation 

diagrams into correspondence with 

the diagrams described in the given 

Operation manual. 

Presence of air locks in the heating 

system because of incorrect 

installation. Power of the boiler does 

not correspond to the power of the 

connected heating devices 

(radiators, convectors, etc.). 

Correct the mistakes in the boiler 

installation. Fill the heating system 

with heat-transfer agent through the 

drain valve under pressure. Put the 

power of the boiler into 

correspondence with the power of 

the connected heating devices. 

3. The boiler consumes nominal 

power but only the standpipe is 

heated. 

Disruption of the heat-transfer 

agent circulation. 

Presence of air locks in the heating 

system. 

Clean the heating system. Wash it 

carefully by means of the “Galan-

Protektor” rust inhibitor. 

Usage of the strainer is mandatory. 

It is necessary to clean the strainer 

periodically. 

Remove the air locks. 

4. In due course, the boiler wastes 

its power gradually (under condition 

of using “fresh water”). 

Presence of contamination, rust, and 

scale on the electrodes and on the 

internal surfaces of the boiler. 

Give the electrodes and the internal 

surfaces of the boiler case a mirror-

like polish. 

 

Guarantee commitments 

 

1.

 

The  guarantee  period of operation comprises 12  months from the date of 

sale. 

2.

 

The boiler life comprises 10 years (under condition of the correct boiler 

operation in accordance with the given Operation manual and periodical 

(every 3-5 years) replacement of the electrodes). 

3.

 

The guarantee commitments are applied to the boiler which is installed by the 

specialized organization which has contractual relationships with the 

manufacturer (under condition of obligatory filling of the boiler installation 

coupon). 

4.

 

The  guarantee commitments  are applied to the boiler  during the course of 

guarantee period of operation. The operation and preventive maintenance are 

performed in accordance with the given Operation manual. 

5.

 

The manufacturer does not bear responsibility for the boilers operation in the 

following cases: 

 

The heating and electric diagrams do not correspond to the diagrams 

specified in the given Operation manual; 

 

The boiler is purchased without automatic control system  recommended 

by the “Firma “GALAN” Joint-Stock Company; 

 

The boiler has mechanical damages; 

 

The boiler worked at the temperatures exceeding the temperatures 

recommended by the given Operation manual or by means of the heat-

transfer agents which are not recommended by the “Firma “Galan” Joint-

Stock Company. 

 

 

Summary of Contents for Ochag-2

Page 1: ...OCHAG GEYSER VULKAN ELECTRODE BOILERS OPERATION MANUAL...

Page 2: ...d by the Firma Galan Joint Stock Company 11 Filling the heating system with heat transfer agent 15 Correcting procedure 16 Preventive maintenance Washing of the heating system 17 Visual examination of...

Page 3: ...ocess of installation of the heating system and boilers and in the course of starting further operation and usage of the electric boilers we convincingly ask you to familiarize yourself attentively wi...

Page 4: ...he Independent Noncommercial Organization on Certification of the Electrical Products 109052 Moscow ul Nizhegorodskaya 29 Voluntary certification Technical characteristics of the boilers produced by t...

Page 5: ...technical characteristics can slightly differ from characteristics resulted in the table above Boilers construction Depending on the boiler power the electrode boilers produced by the Firma Galan Join...

Page 6: ...ation compact size and light weight For example the weight of the boiler the power of which is equal to 6 kW comprises 1 1 kg and the weight of the boiler the power of which is equal to 25 kW comprise...

Page 7: ...automatic control system The electrode boiler cost does not include a cost of the automatic control unit With the exception of the operation manual for electromechanical model of the automatics which...

Page 8: ...the boiler and heating system including metal pipelines for the cold return pipe and hot heat transfer agent should be grounded The place of entering of the conductors into the building or constructio...

Page 9: ...rical installation of the boilers and automatics Three phase electrode boilers are connected to the four wire three phase power network the voltage of which is equal to 380 V Industrial frequency of t...

Page 10: ...unning on solid liquid or gas fuel Legend Laid on thermostat sensor Valve Filter mechanical mud settler Heat transfer agent drain valve Air drain valve Circulation pump power 70 or 100 W A Vertical se...

Page 11: ...on the basis of the specific situation the following temperatures are set on the Navigator temperature regulator Temperature on the outlet of the boiler a value belonging to the recommended optimal o...

Page 12: ...eak sensor water flooding sensor etc The Galan GSM cellular monitoring system of the heating equipment is used in conjunction with the Navigator control unit Perform the installation in accordance wit...

Page 13: ...ipping contactor size 2 up to 32 A 2 1 Automatic tripping contactor coil 220 V 2 2 Thermal relay contacts normally closed 3 Inlet temperature sensor laid on bimetallic thermostat 4 Outlet temperature...

Page 14: ...tic tripping contactor size 2 up to 25 A size 3 up to 40 A 2 1 Automatic tripping contactor coil 380 V 380 V 2 2 Thermal relay contacts normally closed 3 Inlet temperature sensor laid on bimetallic th...

Page 15: ...used for inhibition of corrosion and for scale dissolving The application of low freezing liquid saves from danger of unfreezing the heating system in the event of sudden power supply disconnection A...

Page 16: ...illed in the heating system Stir the dose of the salt solution and the water drawn off from the heating system carefully This mixture is filled in the heating system through the drain valve by means o...

Page 17: ...ost careful control over the boiler s automatic switching on and switching off It is inadmissible to switch on the boiler at presence of the frozen heat transfer agent in the system or in danger of fr...

Page 18: ...acks of the bushing insulators etc and for evaluation of electrodes wear In case of a wear comprises more than 40 the electrode electrodes should be replaced Traditionally this happens every 3 5 years...

Page 19: ...ed b Low freezing liquid as a heat transfer agent Add distilled water clear uncontaminated filtered rain water or snow melt water water the specific electric resistance of which significantly exceeds...

Page 20: ...and lubricating oils gasoline acetone turpentine bitumen roll roofing kerosene oils in the premises where the boiler is installed To dry clothing on the electric boiler shell Transportation and storin...

Page 21: ...e air locks 4 In due course the boiler wastes its power gradually under condition of using fresh water Presence of contamination rust and scale on the electrodes and on the internal surfaces of the bo...

Page 22: ...__________ _____ Performed tasks Executor Owner last name name and surname signature Name of the company performing the warranty repair Place of the seal Post and signature of the director of the com...

Page 23: ...__________ _____ Performed tasks Executor Owner last name name and surname signature Name of the company performing the warranty repair Place of the seal Post and signature of the director of the com...

Page 24: ...ce functions Date description of the maintenance functions License number address signature of the person responsible for performing maintenance functions Seal of the company organization which has pe...

Page 25: ...ery and sale certificate The electrode boiler meets the requirements of the Technical Specifications TS No 3468 001 17289826 02 Date of issue Seal of the Quality Department Sold Date of sale Place of...

Page 26: ...9 196 04 40 196 04 41 123098 Moscow m Shchukinskaya ul Marshala Novikova 2 building 1 http www galan ru e mail office galan ru MAXIMUM WARMTH MINIMUM COSTS OUR COMPANY PERFORMS THE DESIGNING INSTALLAT...