The diameter of vertical standpipe above the boiler and the diameters of all of the 

pipelines of the heating system should meet the project documentation requirements of 

your heating system. The height of vertical standpipe above the boiler should be no less 

than 2 m. It is a reason for abandoning a use of the circulation pump. 

Irrespective of the way of connecting the boiler to the heating system, the boiler 

should be fastened to a wall in the process of the assembly. 

Some of the key diagrams of the heating systems arrangement are depicted in 

Figures 1, 2, 3. For the easy maintenance of the heating system it is necessary to locate the 

shutoff valves on the pipeline right after the surge tank and before the inlet connection of 

the boiler (see Figures 1, 2, 3). 

 

It is strictly forbidden to install valves and other regulating or locking 

mechanisms on the pipeline between the boiler outlet connection and the surge 

tank.  

 

Electrical installation of the boilers and automatics 

Three-phase electrode boilers are connected to the four-wire three-phase  power 

network the voltage of which is equal to 380 V. Industrial frequency of the current is equal 

to 50 Hz. N is a neutral conductor, and PE is a protective conductor of grounding. N and PE 

conductors are decoupled. 

Single-phase electrode boilers are connected to the single-phase power network the 

voltage of  which is equal to  220 V. N is a neutral conductor, and PE is a protective 

conductor of grounding. N and PE conductors are decoupled. 

Connect the electrode boiler to the power network in accordance with the project 

documentation of your heating system and the chosen model of the automatics produced by 

the “Firma “Galan” Joint-Stock Company.  

The observing of the “Phase-Null-Ground” is obligatory! 

Cross section of all wires should be similar and no less than a value specified in the 

Table 1 (electromechanical model of the automatics) of the given Operation manual or no 

less than a value specified in the operation manual of the chosen electronic model of the 

automatic control unit of the heating system. 

Summary of Contents for Ochag-2

Page 1: ...OCHAG GEYSER VULKAN ELECTRODE BOILERS OPERATION MANUAL...

Page 2: ...d by the Firma Galan Joint Stock Company 11 Filling the heating system with heat transfer agent 15 Correcting procedure 16 Preventive maintenance Washing of the heating system 17 Visual examination of...

Page 3: ...ocess of installation of the heating system and boilers and in the course of starting further operation and usage of the electric boilers we convincingly ask you to familiarize yourself attentively wi...

Page 4: ...he Independent Noncommercial Organization on Certification of the Electrical Products 109052 Moscow ul Nizhegorodskaya 29 Voluntary certification Technical characteristics of the boilers produced by t...

Page 5: ...technical characteristics can slightly differ from characteristics resulted in the table above Boilers construction Depending on the boiler power the electrode boilers produced by the Firma Galan Join...

Page 6: ...ation compact size and light weight For example the weight of the boiler the power of which is equal to 6 kW comprises 1 1 kg and the weight of the boiler the power of which is equal to 25 kW comprise...

Page 7: ...automatic control system The electrode boiler cost does not include a cost of the automatic control unit With the exception of the operation manual for electromechanical model of the automatics which...

Page 8: ...the boiler and heating system including metal pipelines for the cold return pipe and hot heat transfer agent should be grounded The place of entering of the conductors into the building or constructio...

Page 9: ...rical installation of the boilers and automatics Three phase electrode boilers are connected to the four wire three phase power network the voltage of which is equal to 380 V Industrial frequency of t...

Page 10: ...unning on solid liquid or gas fuel Legend Laid on thermostat sensor Valve Filter mechanical mud settler Heat transfer agent drain valve Air drain valve Circulation pump power 70 or 100 W A Vertical se...

Page 11: ...on the basis of the specific situation the following temperatures are set on the Navigator temperature regulator Temperature on the outlet of the boiler a value belonging to the recommended optimal o...

Page 12: ...eak sensor water flooding sensor etc The Galan GSM cellular monitoring system of the heating equipment is used in conjunction with the Navigator control unit Perform the installation in accordance wit...

Page 13: ...ipping contactor size 2 up to 32 A 2 1 Automatic tripping contactor coil 220 V 2 2 Thermal relay contacts normally closed 3 Inlet temperature sensor laid on bimetallic thermostat 4 Outlet temperature...

Page 14: ...tic tripping contactor size 2 up to 25 A size 3 up to 40 A 2 1 Automatic tripping contactor coil 380 V 380 V 2 2 Thermal relay contacts normally closed 3 Inlet temperature sensor laid on bimetallic th...

Page 15: ...used for inhibition of corrosion and for scale dissolving The application of low freezing liquid saves from danger of unfreezing the heating system in the event of sudden power supply disconnection A...

Page 16: ...illed in the heating system Stir the dose of the salt solution and the water drawn off from the heating system carefully This mixture is filled in the heating system through the drain valve by means o...

Page 17: ...ost careful control over the boiler s automatic switching on and switching off It is inadmissible to switch on the boiler at presence of the frozen heat transfer agent in the system or in danger of fr...

Page 18: ...acks of the bushing insulators etc and for evaluation of electrodes wear In case of a wear comprises more than 40 the electrode electrodes should be replaced Traditionally this happens every 3 5 years...

Page 19: ...ed b Low freezing liquid as a heat transfer agent Add distilled water clear uncontaminated filtered rain water or snow melt water water the specific electric resistance of which significantly exceeds...

Page 20: ...and lubricating oils gasoline acetone turpentine bitumen roll roofing kerosene oils in the premises where the boiler is installed To dry clothing on the electric boiler shell Transportation and storin...

Page 21: ...e air locks 4 In due course the boiler wastes its power gradually under condition of using fresh water Presence of contamination rust and scale on the electrodes and on the internal surfaces of the bo...

Page 22: ...__________ _____ Performed tasks Executor Owner last name name and surname signature Name of the company performing the warranty repair Place of the seal Post and signature of the director of the com...

Page 23: ...__________ _____ Performed tasks Executor Owner last name name and surname signature Name of the company performing the warranty repair Place of the seal Post and signature of the director of the com...

Page 24: ...ce functions Date description of the maintenance functions License number address signature of the person responsible for performing maintenance functions Seal of the company organization which has pe...

Page 25: ...ery and sale certificate The electrode boiler meets the requirements of the Technical Specifications TS No 3468 001 17289826 02 Date of issue Seal of the Quality Department Sold Date of sale Place of...

Page 26: ...9 196 04 40 196 04 41 123098 Moscow m Shchukinskaya ul Marshala Novikova 2 building 1 http www galan ru e mail office galan ru MAXIMUM WARMTH MINIMUM COSTS OUR COMPANY PERFORMS THE DESIGNING INSTALLAT...

Reviews: