![G-WEIKE LF1390 Use Manual Manual Download Page 20](http://html.mh-extra.com/html/g-weike/lf1390/lf1390_use-manual-manual_555205020.webp)
G.Weike Laser
Profession Laser Manufacturer more than 15 Years.
13
1) Forklift, land transport, etc.
2) Directly beside the equipment install or remove other machines.
3) Machines which will cause vibration in operation, such as punching
machine, bending machine, shearing machine, etc.
3.3.4 The user of the measures should be taken
1. All work must be transported in accordance with the relevant rules
2. Do not allow the machine under no the ground floor, because
otherwise the bottom of the components will be damaged! Machine tool
with foot motherboard must be less than 100 mm above the floor. In the
process of machine tool transportation to the site of installation must also
guarantee the distance from the earth
3. The foundation installation site conditions must meet the requirements of
the installation conditions. Installed in the hall on the floor for slitting,
punching, etc. must be on their own by the user according to the
foundation plan ready before the machine arrive
a. From the truck with a lifting force corresponding truck crane to
unload machine tools.
4. Laser, such as refrigeration device, suction device can use a fork lift truck
directly from the truck transport to the machine installation location
5. On the armoured roller machine tools from outdoor handling in the
workshop
6. With starting power is in the workshop bridge crane or continue on
the armoured roller machine to the installation site
7. To take advantage of the armoured roller machine put to the place of
installation and alignment position, need to use the hydraulic jack
8. Put machine in armoured roller, on the original installation location. If the
position is not enough, you must inform me in advance the user
service company. In this case can put machine tool according to the
negotiation with suppliers on the installation of a placed next to the final
installation site
9. Such as the installation smoothly, laser, refrigeration equipment and
compact dust catcher are placed in the final installation site
G.weike CNC after-sales service
1. Leveling machine: the G.weike leveling machine tool numerical control
of the company's after-sales service and technical personnel.
2. Equipment in operation: by G.weike company service technicians will be
put into operation equipment. Debugging work includes installation of
equipment parts according to the drawing, connect the power of the equipment,
to the teaching staff, and check for machine tool function.
3.3.5 Package
Cooling water machine for laser cutting machine, laser, operation box
and accessories are packed in wooden cases, such as for the other parts are
all in the outer packed in polyethylene foam and protective film packages,