Fusion Installation & Commissioning Manual Approved document No UI-FBU-01 issue 3.0
40
COMMISSIONING
General
When the control panel is installed and the wiring is complete, the system can be
commissioned. The commissioning procedure comprises two main elements:-
(i) connecting the external wiring circuits and powering the panel.
(ii) configuring the system for the required operation.
Conventional Field devices
The control panel operates with the Apollo series 65 Conventional devices, Hochiki CDX range
conventional and accepts a wide range of Conventional field devices of other manufacture.
Field devices should be connected to the radial circuits in accordance with the manufacturers
instructions supplied with them, ensuring that where necessary a 24V DC supply is available,
and monitoring resistors are fitted. The following chart is a brief overview of the supported de-
vices and relevant part numbers. Please consult with Technical support for details of unlisted
devices.
Device
Part no.
Apollo series 65 Ionisation smoke detector
55000-217
Apollo series 65 optical smoke detector
55000-317
Apollo series 65 A1R combined heat detector 57 deg C
55000-122
Apollo series 65 detector base with diode
45681-201
Apollo series 65 TWIN wire detector base
45681-206
Hochiki CDX Optical smoke detector
SLR-E3N
Hochiki CDX combined heat detector 60 deg C
DCD-AE3
Hochiki CDX fixed heat detector 60 deg C
DFJ-AE3
Hochiki CDX detector base with diode
YBN-R-6SK
Hochiki CDX TWIN wire detector base
YBO-R-6PA
Haes Systems remote indicator led for smoke detectors
RIL58
KAC Indoor call point with 470 OHM resistor
MCP1A-R-470
KAC indoor call point with 220 OHM resistor (priority alarm)
MCP1A-R-220
Fulleon motorised centrifugal bells
CFB6D-24
Fulleon Solista low current led beacon
SOL-RL-R
Fulleon Symphony wall mounted sounder
SY-R
Fulleon Roshni wall mounted sounder
ROLP-R
Fulleon Squashni base mounted sounder
SQ-03-W
KAC indoor call point for use with TWIN wire
MCP1B-R-TW