
ix
Figures
Server
2
Slide Rail Assembly
5
Mounting Bracket Locks
6
Cable Management Bracket
7
Locations of Ports and Connectors on the Rear Panel
8
Unlocking the Slide Rail Assembly
12
Mounting Bracket Release Button
13
Attaching a Mounting Bracket to the Chassis
14
Captive Screws on the Slide Rail
15
Using the Extension Bracket
16
Mounting the Slide Rail
17
Using the Slide Rail Spacing Tool to Adjust the Distance Between the Slide Rails
18
Mounting the Chassis on the Slide Rails
20
Rear Panel Connectors
21
System Controller Serial and Network Ports, Rear of Chassis
22
Serial Port (TTYA)
23
AC Connector
27
Summary of Contents for SPARC ENTERPRISE T1000
Page 1: ......
Page 2: ......
Page 6: ......
Page 10: ...viii SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 12: ...x SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 13: ...xi Tables TABLE 1 1 Ethernet Connection Transfer Rates 9 TABLE 3 1 Server Device List 38 ...
Page 14: ...xii SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 16: ...xiv SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 25: ...Preface xxiii Reader s Comment Form ...
Page 36: ...10 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 68: ...42 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 78: ...52 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 82: ...56 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 83: ......
Page 84: ......