
36
SPARC Enterprise T1000 Server Installation Guide • April 2007
▼
To Initiate the Power On Sequence
Powering on the system requires you to use the
poweron
command at the SC
console.
●
To initiate the power-on sequence, issue the
poweron
command.
You see an
sc>
alert message on the system console. This indicates that the system
has reset.
▼
To Connect to the System Console
Output from POST, OpenBoot, and the Solaris OS is displayed in the system console
using the
console
command on the system controller.
●
Execute the
console
command, and use the
–f
option to force the console to be
attached to your session.
Multiple users can be connected to the console, but only one can be attached.
sc>
poweron
SC Alert: Host System has Reset
sc>
sc>
console –f
#.
(Enter #. to return to ALOM)
Summary of Contents for SPARC ENTERPRISE T1000
Page 1: ......
Page 2: ......
Page 6: ......
Page 10: ...viii SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 12: ...x SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 13: ...xi Tables TABLE 1 1 Ethernet Connection Transfer Rates 9 TABLE 3 1 Server Device List 38 ...
Page 14: ...xii SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 16: ...xiv SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 25: ...Preface xxiii Reader s Comment Form ...
Page 36: ...10 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 68: ...42 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 78: ...52 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 82: ...56 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 83: ......
Page 84: ......