
25
C H A P T E R
3
Powering On the System
This chapter includes instructions for booting the server and for enabling the system
controller network management port.
The following topics are discussed:
■
“Powering On the Server for the First Time” on page 25
■
“Logging In To the ALOM CMT System Controller” on page 29
■
“Using the ALOM CMT System Controller for Common Operations” on page 35
■
“Booting the Solaris Operating System” on page 39
Powering On the Server for the First
Time
Power On Overview
System Console
When you power on the system, the boot process begins under the control of the
system console. The system console displays status and error messages generated by
firmware-based tests during system startup.
Summary of Contents for SPARC ENTERPRISE T1000
Page 1: ......
Page 2: ......
Page 6: ......
Page 10: ...viii SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 12: ...x SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 13: ...xi Tables TABLE 1 1 Ethernet Connection Transfer Rates 9 TABLE 3 1 Server Device List 38 ...
Page 14: ...xii SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 16: ...xiv SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 25: ...Preface xxiii Reader s Comment Form ...
Page 36: ...10 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 68: ...42 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 78: ...52 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 82: ...56 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 83: ......
Page 84: ......