
Chapter 3
Powering On the System
35
Using the ALOM CMT System
Controller for Common Operations
Note –
For more information on using ALOM CMT, refer to the
Advanced Lights Out
Management (ALOM) CMT Guide.
TTYC - Internal Loopback Test, PASSED.
TTYD - Internal Loopback Test
TTYD - Internal Loopback Test, PASSED.
....................
Full VxDiag Tests - PASSED
Status summary - Status = 7FFF
VxDiag - - PASSED
POST - - PASSED
LOOPBACK - - PASSED
I2C - - PASSED
EPROM - - PASSED
FRU PROM - - PASSED
ETHERNET - - PASSED
MAIN CRC - - PASSED
BOOT CRC - - PASSED
TTYD - - PASSED
TTYC - - PASSED
MEMORY - - PASSED
MPC885 - - PASSED
Please login:
Summary of Contents for SPARC ENTERPRISE T1000
Page 1: ......
Page 2: ......
Page 6: ......
Page 10: ...viii SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 12: ...x SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 13: ...xi Tables TABLE 1 1 Ethernet Connection Transfer Rates 9 TABLE 3 1 Server Device List 38 ...
Page 14: ...xii SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 16: ...xiv SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 25: ...Preface xxiii Reader s Comment Form ...
Page 36: ...10 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 68: ...42 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 78: ...52 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 82: ...56 SPARC Enterprise T1000 Server Installation Guide April 2007 ...
Page 83: ......
Page 84: ......