
286
Upgrade and Maintenance Manual
RX300
S8
Processors
11.5
Handling processor heat sinks
11.5.1 Preliminary steps
Ê
"Shutting down the server" on page 54
Ê
"Disconnecting power cords" on page 54
Ê
"Getting access to the component" on page 57
11.5.2 Installing processor heat sinks
Figure 157: Standard processor heat sink V26898-B977-V1
Field Replaceable Unit
(FRU)
if thermal paste is involved
Hardware: 15 minutes
Upgrade and Repair Unit
(URU)
Tool:
Phillips PH2 / (+) No. 2 screw driver
Summary of Contents for PRIMERGY RX300 S8
Page 24: ...Upgrade and Maintenance Manual RX300 S8 Contents ...
Page 38: ...38 Upgrade and Maintenance Manual RX300 S8 Before you start ...
Page 72: ...72 Upgrade and Maintenance Manual RX300 S8 Basic hardware procedures ...
Page 158: ...158 Upgrade and Maintenance Manual RX300 S8 Hard disk drives solid state drives ...
Page 166: ...166 Upgrade and Maintenance Manual RX300 S8 System fan ...
Page 242: ...242 Upgrade and Maintenance Manual RX300 S8 Expansion cards and backup units ...
Page 260: ...260 Upgrade and Maintenance Manual RX300 S8 Main memory ...
Page 296: ...296 Upgrade and Maintenance Manual RX300 S8 Processors ...
Page 482: ...482 Upgrade and Maintenance Manual RX300 S8 Cables ...
Page 502: ...502 Upgrade and Maintenance Manual RX300 S8 Appendix ...