
RX300 S8
Upgrade and Maintenance Manual
263
Processors
11.2
Installing processors
V
CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.
11.2.1 Preliminary steps
Ê
"Disabling BitLocker functionality" on page 73
Ê
"Disabling SVOM boot watchdog functionality" on page 74
Ê
"Shutting down the server" on page 54
Ê
"Disconnecting power cords" on page 54
Ê
"Getting access to the component" on page 57
.c
11.2.2 Installing the processor
I
This description applies to the following procedures:
– Installing the second CPU in a mono-processor configuration
– Transfering a CPU after replacing the system board (see section
"Swapping processors" on page 438
)
Upgrade and Repair Unit
(URU)
Hardware: 15 minutes
Software: 5 minutes
Tool:
Phillips PH2 / (+) No. 2 screw driver
Summary of Contents for PRIMERGY RX300 S8
Page 24: ...Upgrade and Maintenance Manual RX300 S8 Contents ...
Page 38: ...38 Upgrade and Maintenance Manual RX300 S8 Before you start ...
Page 72: ...72 Upgrade and Maintenance Manual RX300 S8 Basic hardware procedures ...
Page 158: ...158 Upgrade and Maintenance Manual RX300 S8 Hard disk drives solid state drives ...
Page 166: ...166 Upgrade and Maintenance Manual RX300 S8 System fan ...
Page 242: ...242 Upgrade and Maintenance Manual RX300 S8 Expansion cards and backup units ...
Page 260: ...260 Upgrade and Maintenance Manual RX300 S8 Main memory ...
Page 296: ...296 Upgrade and Maintenance Manual RX300 S8 Processors ...
Page 482: ...482 Upgrade and Maintenance Manual RX300 S8 Cables ...
Page 502: ...502 Upgrade and Maintenance Manual RX300 S8 Appendix ...