
RX300 S8
Upgrade and Maintenance Manual
255
Main memory
Figure 134: Installing memory modules (C)
Ê
Press down on the memory module until the securing clips snap into the
cutouts at each end of the module.
10.2.3 Concluding steps
Ê
"Reassembling" on page 63
Ê
"Connecting the server to the power source" on page 69
Ê
"Switching on the server" on page 71
Ê
"Updating or recovering the system board BIOS and iRMC" on page 80
Ê
"Enabling SVOM boot watchdog functionality" on page 89
Ê
"Verifying the memory mode" on page 90
Ê
"Enabling BitLocker functionality" on page 95
Summary of Contents for PRIMERGY RX300 S8
Page 24: ...Upgrade and Maintenance Manual RX300 S8 Contents ...
Page 38: ...38 Upgrade and Maintenance Manual RX300 S8 Before you start ...
Page 72: ...72 Upgrade and Maintenance Manual RX300 S8 Basic hardware procedures ...
Page 158: ...158 Upgrade and Maintenance Manual RX300 S8 Hard disk drives solid state drives ...
Page 166: ...166 Upgrade and Maintenance Manual RX300 S8 System fan ...
Page 242: ...242 Upgrade and Maintenance Manual RX300 S8 Expansion cards and backup units ...
Page 260: ...260 Upgrade and Maintenance Manual RX300 S8 Main memory ...
Page 296: ...296 Upgrade and Maintenance Manual RX300 S8 Processors ...
Page 482: ...482 Upgrade and Maintenance Manual RX300 S8 Cables ...
Page 502: ...502 Upgrade and Maintenance Manual RX300 S8 Appendix ...