Chapter 2 Installing the Tape Library
2.5 Rack Mounting the Library
FUJITSU Storage ETERNUS LT40 S2/LT60 S2 LTO Library Installing, Starting Up and Maintaining
Copyright 2018 FUJITSU LIMITED
P3AM-5392-07ENZ0
27
2.5.2
Installing the Library in a Rack
The library easily installs into a standard 19" rack system taking up 2 or 4U of space.
■
Required tools
•
#3 Phillips screwdriver or
•
T10 Torx screwdriver
There are two sets of eight M6 screws in the accessory package that came with your library. The type of rack
that you have will determine the type of M6 screw that you will use.
■
Different Rackmount Kits
Note that there are 3 different rackmount rails:
Figure 2.6 3 different rackmount rails
No.
Rackmount rail
Description
1
PRIMECENTER rackmount rail for ETERNUS
LT20 S2/LT40 S2/LT60 S2
A Torx screwdriver is requested. A counternut is entered in the 2.
hole in the ETERNUS LT20 S2 rack or in the 4. hole in the ETERNUS
LT40 S2/LT60 S2 rack.
2
PRIMECENTER M1 rackmount rail for
ETERNUS LT20 S2
The counternuts are already integrated, the screws are fixed with
the help of a Phillips screwdriver.
3
PRIMECENTER M1 rackmount rail for
ETERNUS LT40 S2/LT60 S2
The counternuts are already integrated, the screws are fixed with
the help of a Phillips screwdriver in the 4. hole.
1
2
3
Summary of Contents for ETERNUS LT40 S2
Page 2: ...This page is intentionally left blank ...
Page 110: ......