![Fujitsu AUYG18LVLB Design & Technical Manual Download Page 185](http://html.mh-extra.com/html/fujitsu/auyg18lvlb/auyg18lvlb_design-and-technical-manual_2343816185.webp)
Slit of heat insulating material
facing upward
Covered gas
pipe (heat
insulation
strengthened)
Heat insulating material
(locally purchased)
Small exposed part
of copper pipe is desirable.
Fit tightly
(purpose is to cover the sealant)
Binding material
Flare connection
To indoor unit
Heat insulation reinforcement material
(locally purchased)
Figure 1-2
Work method when reinforcing the heat insulation of on-site piping
- 177 -
1-1. Indoor unit installation precautions
1. Installation precautions
SYSTEM
DESIGN
SYSTEM
DESIGN
Summary of Contents for AUYG18LVLB
Page 151: ...Part 2 OUTDOOR UNIT SIMULTANEOUS MULTI AOYG72LRLA AOYG90LRLA ...
Page 181: ...Part 3 SYSTEM DESIGN ...
Page 333: ...Part 4 OPTIONAL PARTS ...