§ 6.1.3.
Installation of PCB
6.
Refer to Fig. 6.1.4, Fig. 6.1.5. Attach New PCB in reversed order of replacement procedure steps 1
~5. Note - Confirm that cables and connectors are not pinched between the post and screw. This
may be view through the peephole as illustrated.
Left side view of PCB
Battery Frame
Peephole of wiring corfirm
Fig. 6.1.4
Cap screw (M3×6, T=5)
Shield Plate
Main P.C.B.
Spacer (M3, WS3, SLG)
SLG paints only screw head.
Cap screw (M3×6, WS3, SLG)
SLG paints only screw head.
Fig. 8.2.5
7.
Install Program software.
8.
Turn splicer ON, “Initializing... Please wait” message is displayed on the monitor, All parameters
are cleared.
9.
Refer to section 2.4.1. Select “Config Code Input” in [secret menu].
10.
Input configuration codes recorded in Step 2 of section 8.2.1. Note - If you enter an incorrect code
it will be displayed in a “RED” color.
11.
Refer to section 8.2.4. Adjust voltage indicator.
12.
Refer to section 4.21.1. Adjust tube heater temperature.