Page 35
21.
Adjust right side fiber end-face in the “X” view by moving the Focus-Adjuster. Tighten Cap screw
(M3×10, T=12) “1” first and Cap screw (M3x10, T=12) “2” second.
Specification (Y-X) ± 10 line.
Note
–
Target = (Y-X) = 0 ~10 line.
Block gauge
Vertical position screws
Fig. 4.9.6
Focus-Adjuster
Horisontal position screws
A
B
Fig. 4.9.7
22.
Recheck fiber vertical position in Y view.
23.
Recheck gap center position in Y view.
24.
Recheck gap center position in X view.
25.
Recheck fiber vertical position in X view.
26.
Remove all special tools and Block Gauges.