
INZ-TN8ZSS-E
- 89 -
6.11 Check cell
6.11.1 Usage
The check cell is intended to be used to check a deviation of the span point without removing the device
from the stack. However, if the gas concentration inside the stack is not stable, the check is unavailable.
You cannot check the zero point as far as the measured gas exists in the stack.
Summary of Contents for ZSS-8 Series
Page 1: ......
Page 13: ...INZ TN8ZSS E 3...
Page 16: ...6 INZ TN8ZSS E 3 2 Wiring diagram Input output terminal...
Page 17: ...INZ TN8ZSS E 7...
Page 29: ...INZ TN8ZSS E 19 4 8 Piping system diagram Fig 4 9...
Page 42: ...32 INZ TN8ZSS E 5 2 Screen configuration...
Page 57: ...INZ TN8ZSS E 47 About Span Calibration...
Page 76: ...66 INZ TN8ZSS E...
Page 111: ...INZ TN8ZSS E 101 APPENDIX 2 CODE SYMBOLS...
Page 118: ...108 INZ TN8ZSS E DIMENSIONS IN MM...
Page 119: ......