![Froling PE1 Pellet Installation Instructions Manual Download Page 68](http://html1.mh-extra.com/html/froling/pe1-pellet/pe1-pellet_installation-instructions-manual_2338712068.webp)
6 Decommissioning
6.1 Mothballing
The following measures should be taken if the boiler is to remain out of service for
several weeks (e.g. during the summer):
❒ Clean the boiler thoroughly and close the doors fully
If the boiler is to remain out of service during the winter:
❒ Have the system completely drained by a qualified technician
➥ Protection against frost
6.2 Disassembly
To disassemble the system, follow the steps for assembly in reverse order.
6.3 Disposal
❒ Ensure that they are disposed of in an environmentally friendly way in accordance
with waste management regulations in the country (e.g. AWG in Austria)
❒ You can separate and clean recyclable materials and send them to a recycling
centre.
6
Decommissioning
Mothballing
68
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com