![Froling PE1 Pellet Installation Instructions Manual Download Page 46](http://html1.mh-extra.com/html/froling/pe1-pellet/pe1-pellet_installation-instructions-manual_2338712046.webp)
4.7.3 Align the boiler with the floor
After positioning, the boiler must be aligned on the floor. The PE1 Pellet 7-20 Unit
comes without adjusting feet and must be positioned using the boiler underlays
provided.
4x
30
4
Assembly
Install the PE1 Pellet Unit
46
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com