![Froling PE1 Pellet Installation Instructions Manual Download Page 40](http://html1.mh-extra.com/html/froling/pe1-pellet/pe1-pellet_installation-instructions-manual_2338712040.webp)
13
14
3
4
5
6
4.6.3 Aligning the boiler on the floor
After positioning, the boiler must be aligned on the floor. Different approaches are
required depending on the boiler size:
PE1 Pellet 7-20
For the PE1 Pellet 7-20, the adjustable feet are easily accessible with tools from
outside:
15
4
Assembly
Install PE1 Pellet
40
Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com