![Froling PE1 Pellet Installation Instructions Manual Download Page 41](http://html1.mh-extra.com/html/froling/pe1-pellet/pe1-pellet_installation-instructions-manual_2338712041.webp)
PE1 Pellet 25-35
For the PE1 Pellet 25-35, the adjustable feet are only accessible by removing the front
cover plate due to the solid base frame:
16
Unless already carried out for the positioning of the boiler:
❒ Remove the insulated door and cover plate
⇨ See "PE1 Pellet 25-35 – Prepare the boiler for transport and setup" [page 39]
➥ The adjustable feet are accessible after removing the floor insulation
❒ Use a hexagonal spanner to set the adjustable feet in the base frame of the boiler
Assembly
4
Install PE1 Pellet
Installation Instructions PE1 Pellet 7-35 | M1441017_en
41