4.7.7 Expansion with pipe assembly for storage loading
If a storage tank is connected to the PE1 Pellet Unit, an optional pipe assembly for
storage loading is required. This requires the following modifications:
1.
2.
3.
4.
2x M4x8
2x Ø30x2
1.
2.
52
53
54
55
56
57
Assembly
4
Install the PE1 Pellet Unit
Installation Instructions PE1 Pellet 7-35 | M1441017_en
51