4.7 Install the PE1 Pellet Unit
⇨ See "Remove boiler from
pallet" [page 44]
⇨ See "Fit the front cover"
[page 45]
⇨ See "Align the boiler with
the floor" [page 46]
⇨ See "Install the connection
set for room air-independent
operation" [page 47]
⇨ See "Install the connection
set for room air-independent
operation" [page 47]
⇨ See "Expansion with
electronic heating cartridge"
[page 49]
⇨ See "Install boiler filling
and drainage system" [page
50]
⇨ See "Expansion with pipe
assembly for storage loading"
[page 51]
⇨ See "Expansion with pump
assembly for second heating
circuit" [page 53]
⇨ See "Disassemble for
easier transport to the
installation site" [page 57]
⇨ See "Installing the
discharge system" [page
60]
⇨ See "Install the protective
plate for the flue pipe" [page
62]
⇨ See "Hydraulic connection"
[page 63]
⇨ See "Electrical Connection"
[page 64]
Assembly
4
Install the PE1 Pellet Unit
Installation Instructions PE1 Pellet 7-35 | M1441017_en
43