4.5 Setting up in the boiler room
4.5.1 Moving the boiler in the boiler room
❒ Position a fork-lift or similar lifting device with a suitable load-bearing capacity at
the base frame
❒ Lift and transport to the intended position in the installation room
➥ Observe the minimum distances in the boiler room.
4.5.2 Recommended clearances in the boiler room
▪ The system should generally be set up so that it is accessible from all sides
allowing quick and easy maintenance.
▪ Regional regulations regarding necessary maintenance areas for inspecting the
chimney should be observed in addition to the specified minimum distances!
▪ Observe the applicable standards and regulations when setting up the system.
▪ Observe additional standards for noise protection
(ÖNORM H 5190 - Noise protection measures)
Recommended minimum clearances - PE1 Pellet 7-35
A
B
H
D
C
Mea
sure
ment
Description
7 - 10
15 - 20
25 - 35
A
Distance – insulated door to wall
600 mm
B
Distance – side of boiler to wall
(controller side)
300 mm
C
Distance – back to wall
300 mm
D
Distance – side of boiler to wall
(door stop side)
100 mm
Minimum space (length x width) [mm]
1550 x 1000
1550 x 1150
1750 x 1150
H
Minimum room height incl.
maintenance area (1)
190 cm
220 cm
Assembly
4
Setting up in the boiler room
Installation Instructions PE1 Pellet 7-35 | M1441017_en