Table of contents
M2250322_en | Installation instructions Wood chip boiler T4e 200-350
iii
6.3.1 Levelling the boiler ..................................................................................................................... 37
6.3.2 Installing the stoker unit ............................................................................................................. 37
6.3.3 Installing line regulating valve (T4e 200-250) ............................................................................ 38
6.3.4 Installing line regulating valve (T4e 300-350) ............................................................................ 39
6.3.5 Control the return temperature control (T4e 200-250) ............................................................... 40
6.3.6 Control the return temperature control (T4e 300-350) ............................................................... 41
6.3.7 Align the ash container .............................................................................................................. 41
6.5.1 Board overview .......................................................................................................................... 46
6.5.2 Laying cables ............................................................................................................................. 48
6.5.3 Mains connection ....................................................................................................................... 49
6.5.4 Potential equalisation................................................................................................................. 50
6.6.1 Insulate the connection line ....................................................................................................... 52
6.6.2 Install the brackets for accessories............................................................................................ 53
6.6.3 Stick on an additional identification plate (applicable to T4e ESP) ............................................ 53