6 | Assembly
52
M2250322_en | Installation instructions Wood chip boiler T4e 200-350
r
Open the insulated door and remove the cover plate behind
r
Slide the ash container onto the ash duct and secure with the locking lever
r
Adapt the height and distance of the safety limit switch to the key plate on the ash
container
6.6.1 Insulate the connection line
When using the optionally available thermal insulation supplied by Fröling GesmbH,
perform the following steps:
r
Cut the half shells of thermal insulation to length and lay them on the connection line
r
Create an opening for access to the measuring port
r
Apply protective foil at the projecting lugs
r
Glue the half shells to each other