6 | Assembly
48
M2250322_en | Installation instructions Wood chip boiler T4e 200-350
6.5.2 Laying cables
2x
r
Remove the insulating cover and thermal insulation
r
Remove the retaining screw and contact washer from the controller cover
r
Slide the controller cover back and lift off
r
Remove the cover from the stoker cable duct
r
Wire all the components via cable duct (A) in the side panel to the controller box
Ä
Drive for feed screw / discharge system
Ä
Limit switch on gravity shaft cover (not pre-wired)
r
Plug the following components into the cable that is already in place
Ä
Stoker drive
Ä
Glow igniters
r
Ensure that the cables do not touch the hot boiler components