Table of contents
ii
M2250322_en | Installation instructions Wood chip boiler T4e 200-350
3.4.1 Connection line to the chimney.................................................................................................. 10
3.4.2 Measuring port ........................................................................................................................... 11
3.4.3 Draught limiter............................................................................................................................ 11
3.4.4 Explosion flap............................................................................................................................. 11
3.5.1 Combustion air supply at the installation room .......................................................................... 12
3.5.2 Simultaneous operation with other air-drawing systems............................................................ 13
4.4.1 T4e 200 - 250............................................................................................................................. 22
4.4.2 T4e 200 - 250 ESP .................................................................................................................... 23
4.4.3 T4e 300 - 350............................................................................................................................. 25
4.4.4 T4e 300 - 350 ESP .................................................................................................................... 26
4.4.5 Boiler data for planning the flue gas system .............................................................................. 27
4.4.6 Data for planning a backup power supply.................................................................................. 28
5.5.1 Remove cardboard and transport frame .................................................................................... 34
5.5.2 Operating and maintenance areas of the equipment................................................................. 35