Assembly | 6
M2250322_en | Installation instructions Wood chip boiler T4e 200-350
41
6.3.6 Control the return temperature control (T4e 300-350)
r
Remove the back panels
r
Check all of the connections on the return temperature control and tighten if necessary
Ä
Connections may have loosened during transport.
r
IMPORTANT: Before and after filling the system with heated water, check the seal of
the screw connections on the return temperature control
6.3.7 Align the ash container
r
Place the enclosed spacer plate on both ash channels
r
Slide the ash container onto the boiler and attach using clamping lever
r
Loosen the screw connection and adjust castors to the ground
r
Horizontally align the ash container and attach the screw connection
r
Remove the ash container and spacer plate