6
3. Insert the positive (+) and negative (–) ring terminals on the studs of the inverter observing the correct polarity at both
ends.
4. Tighten all connections according to the torque values listed in the table. It also contains the amperage values, plus
the recommended size of cables and terminals.
Battery conductors
CAUTION: Hazard to equipment
- Do not reverse the polarity of the positive (+) and negative (–) battery cables. Otherwise, the product will be damaged.
Check the polarity of all connections before applying battery power.
- Do not place any other object or hardware between the inverter terminal surface and the ring terminal. Overheating
may result.
- Apply antioxidant compound to protect the terminals.
Ring terminal:
Model
Maximum
current
Recommended
battery capacity
Cable size
Ring terminal
Terminal
torque
Cable
mm²
Dimension
Diameter
Length
1KW
109A
100Ah
1x4AWG
22
6.4
29.2
2~ 3 Nm
Summary of Contents for FIO-P11K12
Page 1: ...1KW User Manual 2 y ear w arran ty Off grid hybrid solar inverter and charger FIO P11K12...
Page 34: ...NOTES...
Page 35: ...NOTES...
Page 36: ......