5
For proper ventilation and heat dissipation, allow clearances of approximately 20cm (8in) to either side
and 50 cm (20in) above and below the unit.
WARNING: Shock hazard
All wiring must be performed by qualified personnel. High voltages can be harmful to human life.
4. HARDWARE CONNECTIONS
Battery:
1. First assemble the batteries in series or parallel as needed for the system nominal voltage.
2. Install all cables and interconnections.
NOTES:
• Cables and ring terminals should be sized according to the table below.
• For safety and compliance purposes, install a DC overcurrent protection between this unit and the battery. This is
required for both safety reasons and regulatory compliance. A manual disconnect device may also be required.
These devices should be sized according to the cable size (see table).
• The minimum recommended battery capacity for this model is 100Ah.
• To secure the unit(s) in place, insert the supplied M5x12mm hex screws at points
A
,
B
and
C
. M4 screws can be used
as well.
A
B
C
Summary of Contents for FIO-P11K12
Page 1: ...1KW User Manual 2 y ear w arran ty Off grid hybrid solar inverter and charger FIO P11K12...
Page 34: ...NOTES...
Page 35: ...NOTES...
Page 36: ......