4
Preparation
1. On the underside of the unit, unfasten the screws holding the cover in place.
2. Remove the bottom cover to expose the wired connections and ports.
Leave the screws in a safe place for replacing the cover once the hardware connections are completed.
Mounting the unit
Important
• Mount the unit on concrete or another non-combustible surface only.
• Install the unit at eye level for easy reading of the display panel.
• This product will function most effectively if installed upright.
• For optimal operation, ambient temperature should be between -10°C and 55°C.
• Observe all marked clearance requirements when a single or multiple units are installed.
Mounting and clearances
Summary of Contents for FIO-P11K12