18
16
Charger source priority:
This item controls which
source is used first to
charge the batteries and
power the loads
When the inverter/charger operates in standby, line or fault mode, the
charger source can be programmed as shown below
Solar first
Solar energy will be used to charge
the battery as first priority
AC power will be used to charge
the battery when solar energy is not
available
Utility first (default)
Utility will provide power to the
loads first. Solar energy will be used
to charge the battery when utility
power is not available
Solar and utility
Solar and utility power will be used to
charge the battery at the same time
Only solar
Solar energy will be the only charger
source regardless of whether the AC
is available or not
When the inverter/charger operates in battery mode, only solar energy
will be able to charge the battery as long as this source is available and
sufficient to feed them
18
Alarm control
Alarm on (default)
Alarm off
19
Auto-return to default
display screen
Auto-return screen (default)
Sets the screen to return to the
default display (Input voltage /output
voltage) after 1 minute if no button is
pressed
Stay on current screen
If selected, the display will remain
unchanged
20
Backlight control
Backlight on (default)
Backlight off
22
Beeps when the primary
source is interrupted
Alarm on (default)
Alarm off
Summary of Contents for FIO-P11K12