Recommissioning
OK?
1.
Set up automatic feeder.
2.
Clean outside of automatic feeder with damp cloth.
3.
Fit powder hopper attachment protective grid.
4.
Connect automatic feeder water connection to water tap installed by service engineer using new
hose.
5.
Connect teat to feeding station valve (rationed mode) or to feeding box (ad libitum mode) using
new hose. (Install hose with downwards gradient to automatic feeder).
6.
Connect mixer drain valve, if fitted, and drain channel using hose. The hose may not be extended.
7.
Connect mains plug to socket installed by service engineer and turn on automatic feeder.
8.
Acknowledge the message
failure WT not filled
by pressing
on the hand terminal.
9.
Enter the time and date on the hand terminal using
Device data > Date and time
.
10.
Run cleaning programs.
11.
Fill milk powder (MP).
12.
Call a service engineer to set up the automatic feeder.
Appendix
131
Summary of Contents for TAP5-CH2-25
Page 2: ......
Page 6: ...6 Table of contents ...
Page 102: ...102 Running the automatic feeder ...
Page 119: ...Appendix 119 9 Appendix 9 1 Feeding 9 1 1 Standard feeding plans 9 1 1 1 Group A ...
Page 120: ...120 Appendix 9 1 1 2 Group B 9 1 1 3 Group C ...
Page 121: ...Appendix 121 9 1 1 4 Group D ...
Page 122: ...122 Appendix 9 1 1 5 Template for individual feeding plan ...
Page 123: ...Appendix 123 9 1 2 Basic principle of interval feeding ...