|
46
MN301905 Rev A
Configuration
(with WebCal
®
)
Step Six
STEP 5 – TANK LEVEL CONFIRMATION:
Verify the Height Units, Sensor Height,
Fill-Height, Maximum Range & Dead
Band. All values were entered in the
previous step.
STEP 6 – WRITE TO UNIT:
This WebCal
®
* operation uploads configuration into the sensor. Other features in the section include providing
a custom wiring diagram specific to the signal output and saving the configuration file to your hard drive.
Make sure to save your
configuration file (click on Save
Config File) and to review the
wiring diagram (click on Wiring
diagram).
* For complete information on the WebCal
®
software, please refer to the WebCal
®
manual located at
flowline.com/webcal-software/.