5.
RESPONSIBILITY TABLE
Executive
company
Manufacturer's
service
Remarks
Placement of the unit in accordance with producers documentation .
x
Leading the cables from supply module to control cabinet.
x
refers to
Cube R8 NWS
Cube 20 NWS
Cube 40 NWL
Connection of power supplies to the connectors in the Cube control
cabinet (please observe the correct phase connection).
x
refers to
Cube R8
Cube 20
Cube 40
Connection of power supplies to the connectors in the Cube NW module
(please observe the correct phase connection).
ATTENTION! Before performing this action please finish the task in the
point above.
x
refers to
Cube R8 NWS
Cube 20 NWS
Cube 40 NWL
Connection of power supplies to the connectors in the Cube cooling
section (please observe the correct phase connection).
x
refers to
Cube 50 / 60
Cube 80 / 100
Cube 120 / 160
Lead the power/control cables, temperature sensor and communication
cables to the Cube control cabinet according to device documentation.
x
Installation of air supply / exhaust cover element must be done according
with documentation.
x
not applicable
Cube 40
Installation and connection heat recovery module must be done according
with device documentation.
x
refers to
Cube 80/100 L
Cube 120/160 R
Hydraulic installation and bleeding (remove air) must be correct way.
x
option
Supply and connection of the ventilation ducts.
x
option
Installation of the gas system and bleeding (remove air) must be done
according the device documentation.
x
option
Installation of the siphon and filling the siphon with water.
x
option
Providing service access in accordance with the device documentation.
x
Roofing works to seal the connection and protect between the rooftop
unit and roof structure.
x
Connection of power/control cables, temperature sensors and
communication cables to the Cube control cabinet.
x
First start-up of device.
x