www.flowair.com
| 47
Cube 80 / 100 L
The power cord of the device should be led through the prepared hole [1] to the ZUG terminals in the cooling section [2]. Then
the cable should be connected to the ZUG terminals as described in the further part of the description.
1.
(bottom view)
2.
All activities during connecting to electrical installation must be conducted by qualified staff, having necessary
permissions and certificates to work with live electrical devices according to the laws of the country.