14 |
www.flowair.com
1.17.
Lifting Cube 120/160
All Cube units are equipped with handles for ropes, localized in upper part, allowing to lift the unit. Spreader beam application is
not necessary. Handles for lifting the unit and heat module are indicated in pictures below. To attach the ropes to the integrated
mounting brackets for devices using, 4 standard shackles with a culvert with a 16 mm diameter shank should be taken.
•
Because of load distribution, minimum length of hoisting ropes from handle to hook is 3,5 m. Disobeying this
recommendation may result in damage to unit or even mounting breach.
•
The Cube 120/160 R cannot be raised with the heat recovery module attached. Installation of the heat recovery module