18
NOTE:
YOUR HANDS SHOULD BE
CLEANED AND SANITIZED BEFORE
YOU PERFORM THE FOLLOWING
PROCEDURES.
NOTE:
THE FOLLOWING
PROCEDURES REQUIRE
APPROVED, SERVICEABLE AND
SANITIZED TOOLS AND BRUSHES.
CONTACT YOUR LOCAL
DISTRIBUTOR FOR RECOMMENDED
SUPPLIES.
NOTE:
USE AN APPROVED
CLEANER AND SANITIZER FOR THE
FOLLOWING PROCEDURES. REFER
TO MANUFACTURER’S
INSTRUCTIONS FOR PROPER
PREPARATIONS OF THESE
CLEANING AGENTS.
NOTE:
INSPECT ALL WEAR ITEMS
AND REPLACE IF NECESSARY.
Ensure that the Blending System has
been disassembled and cleaned
according to the DAILY CLOSING
PROCEDURES. This is typically
performed at the close of the previous
business day.
Sanitizing the Blending System
1. Prepare approved sanitizer solution
according to manufacturer’s instructions.
2. Remove the Manifold cap and set it
on a sanitary tray. Spray the 9-Tube
Assembly Manifold opening with
approved sanitizer solution and allow it
to sanitize for at least 1 minute. (See
Figure 8.)
Figure 8
3. Place the 9-Tube Assembly in a
container to catch the sanitizer solution.
(See Figure 9.)
Figure 9
DAILY OPENING PROCEDURES
Summary of Contents for FB 80S-08
Page 4: ...3 PARTS IDENTIFICATION FUNCTIONS General System Overview See Figure 1 ...
Page 5: ...4 Figure 1 ...
Page 6: ...5 Cabinet See Figure 2 ...
Page 7: ...6 Figure 2 ...
Page 8: ...7 Blending Assembly and Related Parts See Figure 3 ...
Page 9: ...8 Figure 3 ...
Page 10: ...9 Syrup Pump and Related Parts See Figure 4 ...
Page 11: ...10 Figure 4 ...
Page 12: ...11 Sanitizer Pump and Related Parts See Figure 5 ...
Page 13: ...12 Figure 5 ...
Page 14: ...13 Electronic Parts and Connections See Figure 6 ...
Page 15: ...14 Figure 6 ...
Page 16: ...15 Spare Parts Kit See Figure 7 ...
Page 17: ...16 Figure 7 ...
Page 18: ...17 ...
Page 30: ...29 ...
Page 46: ...45 ...
Page 67: ...66 ...
Page 68: ...67 ...
Page 69: ...68 ...
Page 70: ...69 ...
Page 71: ...70 ...
Page 72: ...71 ...