49
Connecting the Unit Syrup Line
The syrup lines attached at the lower back of
the cabinet connect the 8 bags of syrup to the
Injector Assembly, with the 9
th
tube connecting
the Sanitizer Tank to the Injector Assembly.
1. Remove the small screw on the back panel
of the Cabinet and remove the panel. (See
Figure 124.)
Figure 124
2. Locate the 9-Tube Lead. Remove the dust
cap and slide the coupler casing down.
(See Figure 125.)
Figure 125
3. Loosen the Lead’s coupler nut and slide the
connection onto the Cabinet slot. (See
Figure 126.)
Figure 126
4. Tighten the coupler nut and the casing to
secure. (See Figure 127.)
Figure 127
5. Align the 9-hole gasket with the coupler pins
of the 9-Tube Lead and place the gasket
against the coupler. Then align the coupler
pins of the two syrup lines and connect the
assemblies. (See Figure 128.)
Figure 128
6. Thread the 9-Tube Assembly coupler nut
onto the Lead’s casing and tighten to
secure. (See Figure 129.)
Figure 129
Summary of Contents for FB 80D Series
Page 5: ...4 General System Overview 13 2 1 3 5 6 15 14 10 8 11 12 9 7 17 16 4 26000 Figure 1...
Page 7: ...6 Outer Cabinet 3 1 2 12 10 7 13 4 5 9 8 6 11 26001 Figure 2...
Page 9: ...8 Inner Cabinet 26002 15 11 13 16 14 11 12 1 9 2 6 6 11 18 19 16 4 5 3 4 17 11 8 10 7 Figure 3...
Page 20: ...19...
Page 24: ...23...
Page 32: ...31...
Page 62: ...61...
Page 72: ...71...