Before you permanently install
9
Certification requirement
People who install and manage networks that contain Firetide products must
complete the Firetide certification program.
Doing tests on a HotPort 5020 edge node
For efficiency, you can set up several nodes at one time.
Before you begin, if you want to add a new HotPort 5020 to an existing 7010/
7020 mesh network, save a copy of the 7010/ 7020 mesh configuration
and apply the file on the edge node.
To configure an edge node and do tests with HotView Pro software:
1.
Put the node on a table.
2.
Make the connections shown in the next figure.
Note.
The administrator computer must have an IP address on the same subnet
as the node. If the node is new, the default IP address is 192.168.224.150.
1
Staging antennas with adapters (HotPort 5020-E shown)
2
Ethernet cable from HotPort 5020-E to OUT port of PoE+ injector
3 Ethernet cable from laptop to IN port of PoE+ injector
4 AC power cord from PoE+ injector to power source
The power LED comes on. The node boots and is ready to use in one minute.
Summary of Contents for HotPort 5020
Page 1: ...HotPort FiretideInstallationGuide HotPort 5020 Edge Nodes Published March 2014 Revised 2016...
Page 2: ......
Page 8: ......
Page 12: ...HotPort 5020 edge nodes 4...
Page 21: ...Beforeyoupermanentlyinstall 13...
Page 41: ...Troubleshooting 33...