5. Maintenance and conversion
5−7
Festo P.BE−CPVSC−E N en 0301a
3
1
2
1
Components to be replaced
2
Tie rod screws unscrewed up to 9 mm
3
2 mm gap to the left and right of the
component to be replaced
Fig.5/1:
Loosening the tie rods
3. Removing the double−solenoid valve Ident. code J":
Both valve plates, control" and work valve" must be
removed.
4. Pull the component forwards so that it can be discon
nected from the plug of the electric circuit. Then lift it up
slightly and pull it forwards away from the tie rod.
Summary of Contents for Smart cubic CPVSC1-VI
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0301a...
Page 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0301a...
Page 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0301a Chapter 1...
Page 22: ...1 Summary of components 1 10 Festo P BE CPVSC EN en 0301a...
Page 23: ...Fitting 2 1 Festo P BE CPVSC EN en 0301a Chapter 2...
Page 31: ...Installation 3 1 Festo P BE CPVSC EN en 0301a Chapter 3...
Page 50: ...3 Installation 3 20 Festo P BE CPVSC EN en 0301a...
Page 51: ...Commissioning 4 1 Festo P BE CPVSC EN en 0301a Chapter 4...
Page 66: ...4 Commissioning 4 16 Festo P BE CPVSC EN en 0301a...
Page 67: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0301a Chapter 5...
Page 77: ...Technical appendix A 1 Festo P BE CPVSC EN en 0301a Appendix A...
Page 87: ...Index B 1 Festo P BE CPVSC EN en 0301a Appendix B...
Page 88: ...B Index B 2 Festo P BE CPVSC EN en 0301a Contents B Index B 1 B 1 Index B 3...