4. Commissioning
4−8
Festo P.BE−CPVSC−E N en 0301a
4.3
Checking the valves and the valve−actuator combination
Please note
Before commissioning the CPV−SC valve terminal, note the
specifications concerning the medium, see section Pilot
control of the valve solenoid coils (auxiliary pilot air)" in
the chapter Installation."
The CPV−SC valve terminal should be commissioned as
follows:
Commissioning variants
Actiivity
Preliminary test of the
pneumatic tubing
Testing the valve−actuator
combination by means of the
manual override
Complete commissioning of the
complete system
Installing and connecting the
complete system Program
control via PLC/industrial PC
Tab.4/4:
Commissioning variants
Commissioning the pneumatic components by means of the
manual override is described below.
Summary of Contents for Smart cubic CPVSC1-VI
Page 2: ......
Page 4: ...Contents and general instructions II Festo P BE CPVSC EN en 0301a...
Page 12: ...Contents and general instructions X Festo P BE CPVSC EN en 0301a...
Page 13: ...Summary of components 1 1 Festo P BE CPVSC EN en 0301a Chapter 1...
Page 22: ...1 Summary of components 1 10 Festo P BE CPVSC EN en 0301a...
Page 23: ...Fitting 2 1 Festo P BE CPVSC EN en 0301a Chapter 2...
Page 31: ...Installation 3 1 Festo P BE CPVSC EN en 0301a Chapter 3...
Page 50: ...3 Installation 3 20 Festo P BE CPVSC EN en 0301a...
Page 51: ...Commissioning 4 1 Festo P BE CPVSC EN en 0301a Chapter 4...
Page 66: ...4 Commissioning 4 16 Festo P BE CPVSC EN en 0301a...
Page 67: ...Maintenance and conversion 5 1 Festo P BE CPVSC EN en 0301a Chapter 5...
Page 77: ...Technical appendix A 1 Festo P BE CPVSC EN en 0301a Appendix A...
Page 87: ...Index B 1 Festo P BE CPVSC EN en 0301a Appendix B...
Page 88: ...B Index B 2 Festo P BE CPVSC EN en 0301a Contents B Index B 1 B 1 Index B 3...